Plaster Board

Living room plaster boardThe roofing is finally complete and the rain gutters are being installed. The cement render on the outside of the extensions to the original cottage has been applied. The pace of building progress is increasing now that the building is fully weather-proof. The under-floor heating pipes are buried under a concrete screed so we can get a better feel for what the eventual floor height will be like. Most of the new build part of the house now has plaster board installed and the plasterers will be on site soon to apply the finishing coat.

Evening Sunshine

RainbowWe arrived at the cottage on a Sunday evening with the low sunlight shining through some short, sharp rain showers.  The sun really brought out the colour of the cedar cladding and gave us an impressive rainbow as the showers moved off to the east. The exterior works should start soon and we will have paving and gravel around the house and a patio across most of the west side.

Lunchtime Paddling

High tide was at lunch time last weekend so we took our sandwiches out in the kayaks and paddled over to Knockbrex beach for lunch. There was a wind from the north west so it was a bit choppy on the way out towards Ardwall Island.

20120906-203928.jpg
On the return journey we stayed in the shelter of Ardwall Island before heading back past Barlocco Island with the wind behind us. We got a good view of Craig Cottage as we paddled up Kirkandrews Bay.

20120906-204443.jpg

Pipes

The under floor heating pipes have now been installed and there are rather a lot of them. This is the kitchen and sun room with spaces left for the kitchen island and cupboard units. The kitchen walls are now insulated and ready for plaster boarding once the floor screed has been laid.

20120906-200945.jpg
There will be 14 heating zones with one zone per room and a couple of extras to cover large floor areas. The picture below shows the main mass of piping heading down the hallway from the manifolds which will be in the cupboard by the main entrance.

20120906-201702.jpg
On the outside it’s been fairly wet but there has been progress on the slating and cedar cladding. The slating is complete apart from finishing round the original cottage chimneys and the cedar cladding is all done. Here’s a view of the mud bath outside the living room.

20120906-202517.jpg