Windows and Doors

Windows installed

Windows installed and cedar cladding under way

The windows and doors have now been installed and are looking good.They arrived from Ling Joinery in Penrith already in their finished state with light natural wood on the inside and blue-grey aluminium cladding on the outside to protect them from the coastal weather. The new extension will be faced with cedar cladding and the first section has just been started around the living room windows. It smells really good. The master bedroom on the right is faced with brick that will be covered with render then painted to match the finish of the original cottage. Work is also under way on the lead flashing on the roof. You can see some of the lead gully work and the roof edging that has already been done. The roof slating will start when the lead work and the zinc roof over the sun room have been completed.
Front Door

Gabrielle admiring the new front door

We decided to add a bit of colour to the overall design by choosing fairly bright red doors for the main entrance door and the door to the entrance porch on the south side of the original cottage. The door wall will be faced with cedar wood cladding. The brick wall is the outside of the kitchen. It will be rendered and painted in the same way as the the master bedroom. There will be a zinc porch roof attached along the edge of the main roof above the red door where there is a gap in the green Roofshield membrane.

The inside of the lounge windows

Here’s the inside of the lounge. The big window will slide open to give access to the patio. The final floor level will be up to the bottom of the windows once the insulation, under floor heating and wood flooring have been installed.
Sun Room

John and the sun room mega-windows

Roof Progress

Meanwhile, back at the building site the roof is now fully boarded and covered with bright green Roofshield membrane. The new back porch is now built and looking good. The windows, cedar cladding, roof slates and the component parts for the outside shed are all on site and just waiting for the next team from the builders to get things moving again.

Inspecting the windows

Inspecting the windows


Roof slates

Roof slates ready for installation and the cedar cladding in front of the garage.

A Break in the Weather

The sun shone for a while last weekend and we managed to get out the kayaks for a paddle southwards along the coast. The wind was from the east so it was very sheltered along the coastline. Here’s Gabrielle in the banana boat approaching the entrance to an interesting sea cave. It looks as though there could be some climbing routes on the cliffs around the cave entrance.

Approaching the cave

Approaching the cave


At the back of the cave

At the back of the cave


We’re not sure of the name of this cave. In a sea kayaking blog it is called Dove Cave but on the Ordnance Survey map, Dove Cave is a larger dry cave further south. The calm seas enabled us to get right in to the back of the cave and get a close look at the sea-eroded rocks. There was enough room inside the cave to turn around the kayaks. We then paddled further south along the coast, navigating the narrow channel behind Meikle Pinnacle and saw a couple more quite large caves.

Paddling out of the cave


On the Geograph web site, these are referred to as Dove Cave and the Whid’s Hole. There were some big bird nests on one of the cliffs and we saw a couple of birds of prey flying off from one of them. We didn’t get a good look at them but we think they were probably peregrine falcons, maybe making use of old ravens’ nests. On the way back to Kirkandrews we had a look in at the natural arch at Rumblekirn and got a good view across the bay to the cottage.
Another Cave

One of the other caves


Under the arch at Rumblekirn

Under the arch at Rumblekirn


Kirkandrews Bay

View of the cottage across Kirkandrews Bay

Wet Woodwork

Even the balmy shores of the Borgue peninsula were not exempt from the recent bouts of stormy weather that caused havoc in other areas of the U.K. last week. The builders have installed the internal wall frames and the roof trusses but it was all looking a bit sad and soggy when we visited last weekend. Here’s Gabrielle paddling around in the living room.

Soggy Living Room

Inspecting the living room progress.

Wading along the hallway

Wading along the hallway


The deepest puddles were in the hallway that leads from the main entrance door down to the living room. We were down in Kirkcudbright for the Jazz Festival staying in a tent on the town camp site, next to Phillip and Miriam’s caravan. Luckily the weather eased off on Saturday afternoon and the camp site was not too boggy. The camp site is very well placed above the town with views out to the estuary and surrounding hills and it’s just a couple of minutes walk down to the local shops and hostelries. The Jazz Festival was well attended and lots of fun although some of the outdoor events had to be cancelled or moved indoors to escape the weather on Friday and Saturday. We went to two nights of back-to-back concerts in the town hall, helped along with plenty of tasty Sulwath Brewery beer.
Kirkcudbright Camp Site

A busy weekend at the Kirkcudbright camp site


Sunny Again

Sunny Again


The cottage roof will be finished in slate tiles and in the Scottish building style these will be nailed onto wooden ‘sarking‘ boards. In the picture below, the digger is being used to raise the sarking boards up to roof height.
Sarking

The builders start the roof sarking


On the way back from the cottage we paid a visit to Glenwhan Gardens near Stranraer. These gardens are at the north end of Luce Bay on an elevated site with extensive views out over the bay and the surrounding moorland. The gardens have a huge collection of plants and gave us plenty of ideas of what might grow well in the Galloway climate.
Glenwhan Gardens

Glenwhan Gardens

We Have Walls

More progress this week. Many thanks to Phillip for these photos from the Diamond Jubilee weekend. The outside walls are now in place. It looks like all of the pieces arrived on site and the internal wall frames are also ready to be installed.

The garage

The garage

Work progressing on the original cottage roof

Work progressing on the original cottage roof

Looking out from the kitchen

Looking out from the kitchen


This is the view from the kitchen, through the sun room to the mega soil pile. I guess that those are most of the frames for the internal walls stacked up on top of the soil pile. The new living room is through the doorway on the right.

Floor Slabs

There has been some good progress on the building work during the last two weeks. The old entrance porch has been removed, the floor areas dug out and the concrete floor slabs have now been poured throughout the building.

John checking out the concrete slabs

John checking out the concrete slabs

Exterior wall panels

Exterior wall panels, ready for installing

The ground levels have also been adjusted to make a reasonable gradient for the access from the gate to the garage and parking area. The tiles have been removed from the cottage roof and scaffolding is in place ready for putting up the walls and working on the roof. The external and some of the internal wall panels are on site and should be in position this week.

Large soil pile

A very large pile of soil

The additional excavations for the floor slabs have left us with an even bigger pile of soil that occupies most of the space between the house and our perimeter fence. Hopefully most of this will be re-deployed in sorting out the garden levels after the building work has been done. The digger driver seems to have had a good time sculpting the soil pile into a very smooth shape.

We were planning to camp in our tent in the garden on Saturday night after a long session of very hot and dusty gardening but we were delighted to be invited to stay with Mike and Karen at their cottage just up the road at Barlocco. After a leisurely breakfast and coffee in the morning sunshine we were back at Craig Cottage to meet Phillip and Miriam who were over from Newcastle for the day.

Gabrielle & Miriam

Gabrielle & Miriam checking the view from the living room window

Plant Transfer

Not much to report on building progress but we should have an update on the building activities next week after we have made a visit this weekend. We have been taking cuttings and dividing up many of our plants at Turnamiddle to give us a good start on the garden at Craig Cottage when we eventually get moved in. We brought down another car-load of plants in the middle of May and cleared out an area of garden to act as a plant nursery until we decide where to put everything next year. We had already cleared an area that we think will be home to the fruit trees and bushes but it had got a little overgrown during the last few months. Here’s Gabrielle clearing it out again.

Weeding

Clearing out the weeds

Meanwhile, John was whacking down the weedy growth in the middle section of the garden with the strimmer and lawn mower.

A challenge for the mower

A challenge for the mower

Here are the plants installed in the nursery bed. They are mainly hostas and geraniums but there are a few other favourites too, including a giant himalayan lily, some lupins, a smilacina and a small yew tree. We hope that they don’t end up as food for the local deer population.

The plant nursery

The plant nursery

Foundations

The builders are now active on site and have been building up the foundations. Some of them are now up to the new floor level so we can get a better idea of how the new building will sit on the site. Here are Gabrielle and Graeme the architect inspecting the progress so far.Foundations and steel work

Foundations and steel work

The foundations are now almost up to the new internal floor height and the steel work is in place for the living room windows, the sun room windows and the garage door.

Garage entrance

Garage entrance

This is the view from the garage end. The ground level inside the building still needs to be lowered by about a metre to get it low enough to pour the concrete slab floors.

Big pile of soil and stones

Soil and stones excavated from the footings and foundations

The demolition and excavations for the footings and foundations created huge piles of soil and stones. The stones on the left were mainly from the dry stone walls and some will be used to re-build walls around the  garage end of the building. Some of the big pile on the right will be used for back-filling and adjusting ground levels around the site.

Site facilitiesHere are the on-site facilities. We liked the name of the suppliers – very appropriate for our location.

Site facilities

Footings

Foundations and concrete blocks

The footings for the foundations have been poured

Here’s a picture of the concrete footings for the building extensions. The concrete blocks are on site ready for building the foundation walls. The steel work for the large window and door openings should also be going up this week.

The Building Work Starts!

Examining the remains of the cottage

The cottage with the external extensions removed

The cottage has been reduced to a basic shell, with all of the later additions and extensions removed. The dry stone walls have been dismantled and piled up in a large stone heap at the end of the garden. The foundation work for the new extensions should be going in during the first week in April.

Inside the cottage

Original wall layouts inside the cottage

Here’s the inside of the cottage with all of the internal walls removed. This has revealed some clues about how the cottage may have originally been configured. The far end was probably the kitchen/living room.

Old kitchen sink support

Old kitchen sink support

We found a porcelain support stand  that presumably held up the original kitchen sink under the window on the far right.The windows were enlarged at the time that the bathroom/bedroom extension was added in the 1960s. It also looks like the lean-to kitchen was originally a shed that was accessed from the outside but a door was added from the inside when the other alterations were made.

Original wallpaper

Original wallpaper

There was some old wallpaper that had been covered over with lath and plaster. There were at least two layers of wallpaper on the original plastered walls that had been hidden away for the last 50 years.