We had a surge of activity in early November with lots of building people on site. The drains are all installed underground, with rain water draining to a soak-away at the front of the house and the house waste water drainage routed to a new septic tank.

Here’s Gabrielle inspecting the septic tank. There’s a lot more of it under the ground. It looks like a lot of rock had to be removed to get it installed. You can also see the heat exchanger unit of the air source heat pump over by the wall of the house. That should be up and running this week, getting the house up to a comfortable temperature.

This is the internal unit for the air source heat pump now installed in the utility room. The tank on the left is a buffer tank which is used to help the heating system work more efficiently by buffering up a supply of hot circulating fluid and avoid the heating system turning itself on and off too frequently. The hot water tank is inside the big white ‘ecodan’ unit.

The water supply is now fully connected up inside the house. This is the plumbing at the main stop cock which will be behind the utility room sink when the cupboard and sink unit has been installed.

The wood flooring is now installed in the bedrooms and living areas and is hopefully adequately protected from ongoing building work under the green plastic sheeting. This is the old cottage living room with the wood burning stove ready for re-installation back into the fireplace. The door on the left leads through to the master bedroom. The door on the right opens into the kitchen.
looked a bit wild and wet last week end
Finishing day still 20th Dec?
Nigel