Plaster Board

The roofing is finally complete and the rain gutters are being installed. The cement render on the outside of the extensions to the original cottage has been applied. The pace of building progress is increasing now that the building is more »

Posted in Uncategorized | Tagged | 1 Comment

Lunchtime Paddling

High tide was at lunch time last weekend so we took our sandwiches out in the kayaks and paddled over to Knockbrex beach for lunch. There was a wind from the north west so it was a bit choppy on more »

Posted in Uncategorized | Tagged | Leave a comment

Pipes

The under floor heating pipes have now been installed and there are rather a lot of them. This is the kitchen and sun room with spaces left for the kitchen island and cupboard units. The kitchen walls are now insulated more »